Skip to product information
1 of 9

Mynt

Mynt FSA Eligible HSA Approved Back Massager, Chair Massager with Soothing Heat, Flexible Massage Chair Pad with Soft S-Curve Longer Track Adjustable Pillow for Diverse Body Contours, Christmas Gift

Mynt FSA Eligible HSA Approved Back Massager, Chair Massager with Soothing Heat, Flexible Massage Chair Pad with Soft S-Curve Longer Track Adjustable Pillow for Diverse Body Contours, Christmas Gift

Regular price $293.98 USD
Regular price $293.98 USD Sale price $293.98 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

Brand: Mynt

Features:

  • Foldable Back Massager: This FSA/HSA eligible lightweight (5.5 lbs) back massager features a foldable design with 2 elastic straps for easy attachment and a carrying handle for portability, making it perfect for use at home and convenient to carry
  • Upgraded Massage Head for Back Relaxation: Unlike traditional cushions with fixed heads, our rolling massage cushion features an innovative 'see-saw' massage head that moves up and down, perfectly contouring to your back. The S-curve track system flexes to your back’s shape, ensuring every spot is massaged for total relaxation
  • Full Back Massage Seat Cushion: This massage chair pad is designed with a 22.45-inch track (4.74 inches longer than most models), covers your entire back from top to bottom. The adjustable pillow accommodates different body types, heights, and chair types for personalized comfort. (Tip: Add a pillow between the cushion and sofa for extra support.)
  • Rolling & Spot Back Massager for Back Pain Relief: The FSA/HSA eligible back massager for chair equipped with 4 massage nodes, targets your upper, lower, and full back. The spot massage function lets you focus on specific areas for pin-point relief. All settings can be easily controlled with the included handheld remote
  • Chair Massger with Soothing Warmth: The optional heat feature provides gentle warmth that helps relax sore muscles and relieve tension. Made from soft velvet fabric, it's more durable and skin-friendly than PU or polyester materials. (Note: The heat temperature reaches 60°C (140°F), but may feel less intense due to the fast-moving massage head and fabric barriers.)
  • Perfect Back Massager Gift: Whether on a sofa, recliner, or office chair, this back massager turns any seat into a comfort zone with its elastic straps. Plus, it automatically shuts off after 15 minutes for safety and convenience. FSA/HSA eligible make it a perfect gift for men and women

Part Number: M14603A07

Package Dimensions: 16.3 x 15.1 x 7.8 inches

View full details